Early works to prepare the site for construction commenced in January 2020 and will continue into 2021 across two packages of works - Early Works Package 1 and Early Works Package 2. Package 2 of early works for the Liverpool Hospital redevelopment is being delivered by contractor, Multiplex. The works in this package include:
The safety of our patients and visitors is a priority at all times. We encourage everybody to follow signs and traffic control that will be in place to ensure safe travel around the construction site. Should you have any questions, please contact the LHAP team on (02) 8738 6670 or email SWSLHD-LHAP@health.nsw.gov.au
We thank you for your assistance and appreciate your patience as we build the Liverpool Health and Academic Precinct. LOCATION OF EARLY WORKS (PACKAGE 2) ON THE HOSPITAL CAMPUS
Dust, noise and vibration
Restricted access to the campus traffic bridge.
Please follow signage and directions for your safety, and allow extra time in case of delays.
About the redevelopment, consectetur adipiscing elit. Omnia peccata paria dicitis. Bonum incolumis acies: misera caecitas. Quis istud possit, inquit, negare? Quare attende, quaeso. Duo Reges: constructio interrete.
Get the latest on events and news peccata paria dicitis.